Accessibility/Mobile Features
Skip Navigation
Skip to Content
Editorial News
Classified Sites

Brandon Sun - PRINT EDITION

New Coulter bridge set to open at end of month

The washed-out Highway 251 bridge over the Souris River east of Coulter is seen in 2011.

FILE PHOTO Enlarge Image

The washed-out Highway 251 bridge over the Souris River east of Coulter is seen in 2011.

After years of waiting and anticipation, the bridge between Coulter and Waskada will officially open at the end of the month after it was washed away in the summer of 2011.

The important traffic corridor connecting the two communities on Highway 251 has been under construction since January 2013 and the grand opening will take place at 11 a.m. on March 29 on the east side of the bridge.

The bridge was a high priority for the government for a number of reasons, including the amount of oil drilling activity that is going on in the southwestern corner of Manitoba.

The bridge’s absence meant a 40-minute detour for some and as a result, some residents built an ice route across the Souris River in 2012, but the road was barricaded by the province over safety concerns.

» Brandon Sun

Republished from the Brandon Sun print edition March 15, 2014

  • Rate this Rate This Star Icon
  • This article has not yet been rated.
  • We want you to tell us what you think of our articles. If the story moves you, compels you to act or tells you something you didn’t know, mark it high. If you thought it was well written, do the same. If it doesn’t meet your standards, mark it accordingly.

    You can also register and/or login to the site and join the conversation by leaving a comment.

    Rate it yourself by rolling over the stars and clicking when you reach your desired rating. We want you to tell us what you think of our articles. If the story moves you, compels you to act or tells you something you didn’t know, mark it high.

Sort by: Newest to Oldest | Oldest to Newest | Most Popular 0 Commentscomment icon

You can comment on most stories on brandonsun.com. You can also agree or disagree with other comments. All you need to do is register and/or login and you can join the conversation and give your feedback.

There are no comments at the moment. Be the first to post a comment below.

Post Your Commentcomment icon

Comment
  • You have characters left

The Brandon Sun does not necessarily endorse any of the views posted. Comments are moderated before publication. By submitting your comment, you agree to our Terms and Conditions. New to commenting? Check out our Frequently Asked Questions.

After years of waiting and anticipation, the bridge between Coulter and Waskada will officially open at the end of the month after it was washed away in the summer of 2011.

The important traffic corridor connecting the two communities on Highway 251 has been under construction since January 2013 and the grand opening will take place at 11 a.m. on March 29 on the east side of the bridge.

Please subscribe to view full article.

Already subscribed? Login to view full article.

Not yet a subscriber? Click here to sign up

After years of waiting and anticipation, the bridge between Coulter and Waskada will officially open at the end of the month after it was washed away in the summer of 2011.

The important traffic corridor connecting the two communities on Highway 251 has been under construction since January 2013 and the grand opening will take place at 11 a.m. on March 29 on the east side of the bridge.

Subscription required to view full article.

A subscription to the Brandon Sun Newspaper is required to view this article. Please update your user information if you are already a newspaper subscriber.

letters

Make text: Larger | Smaller

Brandon Sun Business Directory
The First World War at 100

Social Media