How the dike will be cut

Advertisement

Advertise with us

As early as noon today, the province will cut a hole in Provincial Road 331 southeast of Portage la Prairie to release flood water from the Assiniboine River.

Read this article for free:

or

Already have an account? Log in here »

We need your support!
Local journalism needs your support!

As we navigate through unprecedented times, our journalists are working harder than ever to bring you the latest local updates to keep you safe and informed.

Now, more than ever, we need your support.

Starting at $15.99 plus taxes every four weeks you can access your Brandon Sun online and full access to all content as it appears on our website.

Subscribe Now

or call circulation directly at (204) 727-0527.

Your pledge helps to ensure we provide the news that matters most to your community!

To continue reading, please subscribe:

Add Brandon Sun access to your Free Press subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on brandonsun.com
  • Read the Brandon Sun E-Edition, our digital replica newspaper
Start now

No thanks

*Your next subscription payment will increase by $1.00 and you will be charged $20.00 plus GST for four weeks. After four weeks, your payment will increase to $24.00 plus GST every four weeks.

Hey there, time traveller!
This article was published 11/05/2011 (5265 days ago), so information in it may no longer be current.

As early as noon today, the province will cut a hole in Provincial Road 331 southeast of Portage la Prairie to release flood water from the Assiniboine River.

Here’s how they will do it:

Heavy machinery will cut a 65-metre-wide channel in the road near an oxbow in the river. An oxbow is a former section of river channel that’s been cut off by channel erosion. But with the Assiniboine rising, the oxbow has filled up with water.

Submitted
This image released by the province show the location of the controlled release and the size of the planned cut to be made at the Hoop and Holler Bend.
Submitted This image released by the province show the location of the controlled release and the size of the planned cut to be made at the Hoop and Holler Bend.

Crews will leave one-quarter of the road in place, to be taken out quickly when needed.

They will then fill in the open area with rock to act as a temporary dam.

When needed, the rock will be removed and the rest of the road taken out to release water from the Assiniboine.

Rock will be put back in to close it off once enough water has been released.

Enough rock is being hauled to the site to make sure the “notch” does not become an uncontrolled breach.

Report Error Submit a Tip

Flood

LOAD MORE