Sturgeon Refinery says it is processing bitumen after two years of delays
Advertisement
Read this article for free:
or
Already have an account? Log in here »
We need your support!
Local journalism needs your support!
As we navigate through unprecedented times, our journalists are working harder than ever to bring you the latest local updates to keep you safe and informed.
Now, more than ever, we need your support.
Starting at $15.99 plus taxes every four weeks you can access your Brandon Sun online and full access to all content as it appears on our website.
Subscribe Nowor call circulation directly at (204) 727-0527.
Your pledge helps to ensure we provide the news that matters most to your community!
To continue reading, please subscribe:
Add Brandon Sun access to your Free Press subscription for only an additional
$1 for the first 4 weeks*
*Your next subscription payment will increase by $1.00 and you will be charged $20.00 plus GST for four weeks. After four weeks, your payment will increase to $24.00 plus GST every four weeks.
Read unlimited articles for free today:
or
Already have an account? Log in here »
Hey there, time traveller!
This article was published 21/05/2020 (2046 days ago), so information in it may no longer be current.
CALGARY – The operators of the $9.7-billion Sturgeon Refinery say it is now processing oilsands bitumen as designed after two years of delays blamed mainly on equipment failures.
According to an update on its website, the refinery northeast of Edmonton is “now fully operational,” having switched to bitumen feedstock in April for its production of diesel and other fuels.
Construction was completed on the refinery in the fall of 2017 and it was to begin processing as much as 80,000 barrels per day of heavy bitumen in early 2018 after starting up with partly upgraded synthetic crude from oilsands mines.
But that was delayed by issues with equipment including its gasifier, a unit designed to break down the heavier parts of the bitumen barrel to make hydrogen for the refining process and carbon dioxide for use in stimulating conventional oil and gas wells.
Following a maintenance shutdown late last year, the refinery was restarted, again using synthetic crude feedstock while preparing for startup of the gasifier.
The refinery is a joint venture of North West Refining and oilsands producer Canadian Natural Resources Ltd., which is to provide 25 per cent of its bitumen feedstock. The rest of the feedstock is to come from the Alberta government-owned Alberta Petroleum Marketing Commission.
This report by The Canadian Press was first published May 21, 2020.
Companies in this story: (TSX:CNQ)